Case Study

Laim

Details

1 Floor

Landsberger Str. 161

 80687 München

Where we jumped in

We helped manage this project from the detailed design phase through to completion, with all defects resolved.

Challenges

This project was challenging as COVID caused delays in the supply chain and the basement store was in operation during the construction phase. By planning all phases in great detail and determining the best logistical routes.

Added Value

Our knowledge of Self-Storage, construction in Bavaria and the architects in-depth knowledge of conversion turned out to be a great fit. 

We were able to complete this project within budget and on time.

Client: Shurgard

Type: Self-Storage

Started: March 2021

Completed: December 2021

Project Type: Conversion

Role: Project Management

Mastered Challenges

  • COVID
  • construction during ongoing operations 
  • A tight timetable

Other Projects

INDUSTRIAL

Laim

For Shurgard Self-Storage

INDUSTRIAL

Berlin

For Shurgard Self Storage

RESIDENTIAL

Munich

For Ten Brinke Group

Limited Availability!

We Only Take On One Project At a Time

To guarantee exceptional quality and personalized service, we take on only one project at a time.

Contact us today to secure your spot and start building your dream home!

info@goldenpalmhome.com